Shanghai Jinming International Freight Forwarding Co., Ltd. · 24/7 Hotline 021-65633133
🌐 English

Laem Chabang Port Expands Capacity by 3.5 Million TEU with Terminal D

Ports

Hutchison Ports Thailand completed Terminal D at Laem Chabang Port, adding 3.5 million TEU of annual capacity to address 97% port utilization.

Hutchison Ports Thailand (HPT) has finalized the construction of Terminal D at Laem Chabang Port, a project that introduces an additional 3.5 million TEU of annual handling capacity. While the official ceremony took place on November 26, the facility is scheduled to become fully operational by March 2026.

Key points

  • The terminal covers 77 hectares (770,000 sq m) and features a 1,700-meter quay with a water depth of 16 meters.
  • The facility utilizes advanced technology, including 17 remote-controlled ship-to-shore cranes and 48 remote-operated yard cranes.
  • This development is part of a broader initiative to increase the port's capacity by 7 million TEU over the next four years.
  • The project was developed at a cost of $620 million to alleviate current 97% utilization rates.

Background

The expansion is a strategic response to rising cargo volumes and the necessity of accommodating larger container vessels. It serves as a critical component of Thailand's Eastern Economic Corridor (EEC) strategy, which integrates port infrastructure with industrial hubs for electronics and automotive exports. To further address operational bottlenecks, the Port Authority of Thailand (PAT) is currently evaluating a potential fourth expansion phase.

What it means for shippers

For international importers and exporters, this expansion will reduce congestion at Laem Chabang Port, which is located 130 km southeast of Bangkok. The increased capacity allows for larger vessels and improved reliability for direct international routes. Furthermore, the focus on increasing transhipment cargo—targeting a 1% to 10% share of container throughput—is intended to make the port more competitive against regional hubs like Port Klang and Singapore. The integration of automated and electric equipment ensures that operations can continue 24 hours a day with minimal downtime.

JM Trans view

Shippers should prepare for improved vessel turnaround times and more consistent schedules as the new terminal capacity comes online in 2026. For reliable logistics planning, we recommend utilizing our Ocean Freight service to manage your Thailand-bound shipments. Please call +86 21-65633133 to request a quote for your specific shipping needs.

FAQ

When will Terminal D at Laem Chabang Port be fully operational?

The terminal is scheduled to become fully operational in March 2026.

How much additional capacity does Terminal D provide?

Terminal D adds 3.5 million TEU of annual handling capacity to the port's infrastructure.

Related serviceOcean FreightFCL · LCL · Special Containers · Breakbulk · Ro-Ro · DG →

#Laem Chabang Port expansion#Thailand shipping news#ocean freight from China#Shanghai freight forwarder#Thailand port capacity#Hutchison Ports Thailand

← Back to news

Related news